BUILT FOR THE FIELD

Every undocumented
change
is money you can't collect.

Capture field evidence on-site. ScopeSnap interprets the scope change, calculates cost and schedule impact, and generates a professional change order ready for client approval.

Start 14-Day Trial

14-day trial. Card required. Cancel before the trial ends to avoid a charge.

North wall crack.jpg

Photo · just now

Voice note · 0:47

Extra labor, footer depth change

Text note

Owner requested 3 extra circuits

Plan screenshot

Revised electrical layout

CHANGE ORDERCO-2024-042

Riverside Commons – Unit 4B

Footer depth +18"
Electrical circuits (3)
Wall crack repair
Additional labor (6 hrs)
Total Due$5,160

Three ways contractors lose money they already earned.

Every undocumented change is a claim you can't defend.

Undocumented changes

Verbal agreements vanish. Without written evidence, the client says it was already included — and you absorb it.

Missed cost drivers

Field conditions, access constraints, and unforeseen demolition don't appear on drawings. You know they happened — you need to prove it.

Slow or disputed approvals

A poorly documented CO gets disputed. The dispute puts your payment on hold while the back-and-forth plays out — with no paper trail to support your position.

Capture from the field

Capture from the field

Price scope changes clearly

Price scope changes clearly

Keep plans, photos, and approvals together

Keep plans, photos, and approvals together

From field condition to signed change order.

Four steps. Capture in the field. Interpret, calculate, and send for approval.

1

Capture evidence

On-site photo, voice note, or blueprint upload. Tagged to your project with timestamp and location.

2

Interpret scope

ScopeSnap reads your evidence — drawings, notes, and voice — and identifies what changed and why.

3

Calculate impact

Labor, materials, equipment, overhead, and profit are itemized. Schedule days are calculated and the contract total updates automatically.

4

Send for approval

Client receives a link — no account needed. They approve, dispute, or request changes. You track status in real time.

Blueprint Interpretation

Your blueprints tell part of the story.
Your field notes tell the rest.

Upload any plan — PDF, JPG, or HEIC — and ScopeSnap reads the drawing with OCR. You mark up the changed area directly on the plan, note the sheet number, and describe what changed and why. The AI connects your markup to a scope interpretation before you touch the cost form.

  • Upload PDF, JPG, PNG, or HEIC blueprints
  • OCR reads callouts, dimensions, and notes from the plan
  • Mark up the changed area directly on the drawing
  • Store sheet number and detail reference with every CO
  • AI generates scope interpretation — contractor reviews and confirms
Step 1
Plan uploaded
Sheet A2.1 — Electrical layout
Step 2
Area marked
Panel location — NE corner, column B4
Step 3
OCR extracted
"200A panel, 42-circuit, NEMA 3R enclosure"
Step 4
AI scope summary ready
Electrical panel upgrade — contractor review required before sending
Cost Formula Engine

Every cost driver captured.
Every dollar justified.

ScopeSnap uses the same pricing formula that professional estimators use — built into every change order, automatically.

The Formula

Labor Crew hours × rate, including any premium time
Materials Quantities and unit costs for all new or changed material
Equipment Rental, mobilization, or operating cost for specialized equipment
Overhead Applied as a percentage of base cost — your rate, your rules
Profit Applied to base + overhead — set per project or company default
= CO Net Change → Added to contract total

Change Reason Drivers

The reason a change occurred is part of the cost estimate, not a side note. ScopeSnap asks for the reason up front so it's documented before the number is sent.

Owner request
Field condition
Code requirement
Design revision
Unforeseen condition
Failed inspection
Material substitution
Access difficulty
Demolition required
Schedule disruption
Equipment requirement
Subcontractor coordination

What every change order includes

Feature-complete from day one — no manual formatting required.

Photo evidence log

Time-stamped photos attached directly to the CO.

Voice transcript

Record on-site. Transcribed and linked to the scope description.

AI scope summary

Professional language generated from your field notes and drawings.

Itemized cost breakdown

Labor · Materials · Equipment · Overhead · Profit — line by line.

Schedule impact

Days added or reduced. Adjusted completion date calculated automatically.

Approval trail

Pending, approved, or disputed — tracked and timestamped per CO.

Built for the people in the field

Whether you run a two-person crew or manage a team of PMs, ScopeSnap fits your workflow.

Specialty Contractors
Electrical, plumbing, HVAC, framing
General Contractors
Manage subs, track all COs in one place
Remodelers
Residential scope changes documented on-site
Project Managers
Desktop ledger view, approval tracking

Works standalone from day one. No third-party account required.

Choose the billing schedule that fits your business.

Every subscription starts with the same 14-day trial. Card required.

14-DAY TRIAL
ScopeSnap subscription
Current pricing

The exact monthly and annual prices are shown before checkout.

  • Card required to start the trial
  • First charge date shown before checkout
  • Cancel in Settings before the trial ends to avoid a charge
Start 14-Day Trial

Your exact amount and first charge date are shown before checkout. Plans renew automatically until canceled in Settings.

Common questions

14-DAY TRIAL · CARD REQUIRED

Your next change order
is already happening on-site.

Document it in the field. Interpret the scope. Price the impact. Send it for approval.

Start 14-Day Trial

Paid plans from $49/mo · Cancel anytime · No setup fees